MIE INDUSTRIAL SDN BHD

Project EMSB CGC & RD project, Ethane Maximizing (EMAX) Project Owner Ethylene Malaysia Sdn Bhd Client Toyo Engineering & Construction Sdn Bhd Project Scope Engineering, Procurement, Construction and Commissioning Detail works a. Involve in the Electrical and Instrument tender package process of the project at the begining stage. b. To design electrical job according to Petronas Technical Specification (P.T.S -13.0) and local authorities. Electrical packages design including following drawing and document : 1. To design Single Line drawing, 2. To design Street Lighting layout 3. To design Hazardous Area Classification area layout according to IP part15 –Area Classification Code for Petroleum Installations 4. To design Grounding plan layout 5. To design Area Lighting and Convenient Layout 6. To design Typical Detail Installation 7. To design Cable Sizing and Voltage Drop Calculation 8. Illumination Calculation 9. To design Electrical Cable Schedule 10.To design Electrical Connection Schedule 11.To design Motor Control Schedule 12.To design Electrical Wiring layout. c. To manage and monitoring a team of engineers, QA/QC inspector, supervisors and workers for the construction works.

Construction
Shah Alam, Selangor
Founded in unknown
201-500 employees

Project EMSB CGC & RD project, Ethane Maximizing (EMAX) Project Owner Ethylene Malaysia Sdn Bhd Client Toyo Engineering & Construction Sdn Bhd Project Scope Engineering, Procurement, Construction and Commissioning Detail works a. Involve in the Electrical and Instrument tender package process of the project at the begining stage. b. To design electrical job according to Petronas Technical Specification (P.T.S -13.0) and local authorities. Electrical packages design including following drawing and document : 1. To design Single Line drawing, 2. To design Street Lighting layout 3. To design Hazardous Area Classification area layout according to IP part15 –Area Classification Code for Petroleum Installations 4. To design Grounding plan layout 5. To design Area Lighting and Convenient Layout 6. To design Typical Detail Installation 7. To design Cable Sizing and Voltage Drop Calculation 8. Illumination Calculation 9. To design Electrical Cable Schedule 10.To design Electrical Connection Schedule 11.To design Motor Control Schedule 12.To design Electrical Wiring layout. c. To manage and monitoring a team of engineers, QA/QC inspector, supervisors and workers for the construction works.

Company Information

Industry
Construction
Company Type
Privately Held
Founded
unknown
Employee Range
201-500
Revenue Range
Not available

Location

Address
City
Shah Alam
Region
Selangor
Postal Code
47100
Country
Malaysia

Web Presence

Ready to automate your outreach?

Get unlimited access to our company database — complete with detailed profiles, funding info, and tech stacks — and start sending personalized emails with AI-powered follow-ups.

Frequently Asked Questions